0
0
Yesterday
Simple build order 1. Mark the ful...
Simple build order 1. Mark the full 41 x 27 rectangle before placing any pillars. 2. Build the foundation/floor and verify both dimensions twice. 3. Place the pillar grid, then lower walls and large arched windows. 4. Build catwalk levels and the main vaulted roof frame. 5. Finish glass/copper roof, chimneys and exterior detailing. 6. Only then install Create belts, shafts, assembly lines and logistics. Placement X260-300, Z205-231 Connections West: Workshop. East: Storage. North: utility/smeltery route. South: central plaza and transport. Block-counting rule Outline the whole footprint first and verify its width/depth before raising walls. Then follow the local grid on the next page.
